A can lay a railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in ____ ?
A. 9.6
B. 6
C. 12
D. 23Part of work completed by A and B in 4 days
= 4*((1/16) + (1/12))
= 7/12 C can complete 5/12th of the work in 4 days C can complete the whole job in
4÷(5/12) = 9.6 daysTwelve men can do a work in twenty days while twenty women can finish the same work in sixteen days. Find the ratio between the capacity of a man and a woman ?
A. 5:3
B. 4:3
C. 3:4
D. 5:4Part of work completed by a man in a day = 1/(12*20)
= 1/240 Part of work completed by a woman in a day = 1/(20*16) = 1/320 Ratio of their capacities
= (1/240):(1/320) = 320:240 = 4:3A and B can do a piece of work in 12 days; B and C in 15 days; C and A in 20 days. A alone can do the work in ____ ?
A. 60 days
B. 50 days
C. 40 days
D. 30 daysA tap can fill a tank in 32 min. and another can empty it in 16 min. If the tank is already half full and both the tanks are opened together, the tank will be ____ ?
A. 16 min
B. 24 min
C. 12 min
D. 7 minA leak in the bottom of a tank can empty the full tank in 6 hrs. An inlet pipe fills water at the rate of 4 lit. a minute. When the tank is full, the inlet is opened and due to the leak, the tank is empty in 8 hrs. The capacity of the tank in liters is ____ ?
A. 6,890 litres
B. 5,750 litres
C. 5,760 litres
D. None of themP can do a work in the same time in which Q and R together can do it. If P and Q work together, the work can be completed in 10 days. R alone needs 50 days to complete the same work. then Q alone can do it in _____ ?
A. 25 days
B. 15 days
C. 30 days
D. 20 daysWork done by P and Q in 1 day = 1/10
Work done by R in 1 day = 1/50
Work done by P, Q and R in 1 day = 1/10 + 1/50 = 6/50
But Work done by P in 1 day = Work done by Q and R in 1 day . Hence the above equation can be written as
Work done by P in 1 day × 2 = 6/50
=> Work done by P in 1 day = 3/50
=> Work done by Q and R in 1 day = 3/50
Hence work done by Q in 1 day = 3/50 – 1/50 = 2/50 = 1/25
So Q alone can do the work in 25 days10 men can complete a work in 7 days. But 10 women need 14 days to complete the same work. How many days will 5 men and 10 women need to complete the work ?
A. 4
B. 7
C. 12
D. 17Work done by 10 men in 1 day = 1/7
Work done by 1 man in 1 day = (1/7)/10 = 1/70
Work done by 10 women in 1 day = 1/14
Work done by 1 woman in 1 day = 1/140
Work done by 5 men and 10 women in 1 day = 5 × (1/70) + 10 × (1/140)
= 5/70 + 10/140 = 1/7
=> 5 men and 10 women can complete the work in 7 daysP and Q need 8 days to complete a work. Q and R need 12 days to complete the same work. But P, Q and R together can finish it in 6 days. How many days will be needed if P and R together do it ?
A. 3
B. 15
C. 25
D. 8Let work done by P in 1 day = p
work done by Q in 1 day =q
Work done by R in 1 day = r
p + q = 1/8 —(1)
q + r= 1/12 —(2)
p+ q+ r = 1/6 —(3)
(3) – (2) => p = 1/6 – 1/12 = 1/12
(3) – (1) => r = 1/6 – 1/8 = 1/24
p + r = 1/12 + 1/24 = 3/24 = 1/8
=> P and R will finish the work in 8 daysRunning at the same constant rate, 6 identical machines can produce a total of 270 bottles per minute. At this rate, how many bottles could 10 such machines produce in 4 minutes ?
A. 1800
B. 450
C. 2700
D. 1080= 270/6 Number of bottles produced by 10 machines in 4 minutes
= (270/6)*10*4 = 1800A alone can finish a work in X days. B alone can finish the same work in X+5 days. Together, they take 6 days to complete the work. Find X ?
A. 5
B. 17
C. 35
D. 10Part of work completed by A in a day = 1/X Part of work completed by B in a day
= 1/(X+5) (1/X)+(1/(X+5)) = 1/6 (2X+5)/(X²+5X) = 1/6 X²+5X = 6(2X+5) X²-7X-30=0 Solving, X=10