Basic Mathematics MCQs with answers cover topics such as Math MCQs PDF, Math MCQs with answers PDF, Basic Mathematics MCQs with answers, averages, areas, percentages, solving math problems, all mathematical formulas, basic algebra, basic math, arithmetic, and geometry MCQs. These Math MCQs range from basic to advanced levels, providing preparation for tests. Includes Mathematics MCQs PDF, Basic Mathematics MCQs with solutions PDF for download, Mathematics MCQs online test, and Math MCQs for PPSC, FPSC, NTS, SPSC, PTS, OTS, KPPSC, BPSC, and ETEA past papers.

A and B can finish a piece of work in 20 days .B and C in 30 days and C and A in 40 days. In how many days will A alone finish the job ?
A. 45
B. 48
C. 34(2/7)
D. 44(1/A)+(1/B) = (1/20) (1/B)+(1/C) = (1/30) (1/A)+(1/C) = (1/40) Solving the three equations,
A=48Bilal can do a work in 15 days and Jalal in 12 days. If they work on it together for 4 days, the fraction of work that is left is ?
A. 4/7
B. 1/4
C. 3/5
D. 2/5Part of work completed by Bilal in a day = 1/15 Part of work completed by Jalal in a day = 1/12 Part of work completed by them in a day = (1/15)+(1/12) = 3/20 Part of work completed by them in 4 days = (3/20)*4 = 3/5 Fraction of work left
= 1-(3/5)
= 2/5A and B can do a work in 8 days, 13, and C can do the same work in 12 days. A, B and C together can finish it in 6 days. A and C together will do it in ?
A. 12 days
B. 8 days
C. 4 days
D. 6 days(A + B + C)’s 1 day’s work = 1/6; (A + B)’s 1 day’s work = 1/8 (B + C)’s 1 day’s work = 1/12 (A + C)’s 1 day’s work = ( 2 X 1/6 ) – ( 1/8 + 1/12 ) = ( 1/3 – 5/24 ) = 3/24 = 1/8 So, A and C together will do the woirk in 8 days.
A can do a certain work-in the same time in which B and C together can do it. If A and B together could do it in 10 days and C alone in 50 days, then B alone could do it in ?
A. 25 days
B. 30 days
C. 15 days
D. 20 days(A + B)’s 1 day’s work = 1/10; C’s 1 day’s work = 1/50 (A + B + C)’s 1 day’s work = 1/10 + 1/50 = 6/50 = 3/25 Also, A’s 1 day’s work = (B + C)’s 1 day’s work
From (i) and (ii), we get : 2 x (A’s 1 day’s work) = 3/25 As 1 day’s work = 3/50 B’s 1 day’s work = 1/10 – 3/50 = 2/50 = 1/25 So, B alone could do the work in 25 days.A and B can do a piece of work in 72 days; B and C can do it in 120 days; A and C can do it in 90 days. In what time can A alone do it?
A. 120 days
B. 150 days
C. 80 days
D. 100 daysTwenty women can do a work in sixteen days. Sixteen men can complete the same work in fifteen days. What is the ratio between the capacity of a man and a woman?
A. 1 : 3
B. 5 : 3
C. 3 : 4
D. 4 : 3X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone and then after 4 days Y joined him till the completion of the work. How long did the work last?
A. 15 days
B. 20 days
C. 10 days
D. 6 daysA and B together can complete a work in 1.2 days,. A alone can complete it in 20 days. If B does the work only for half a day daily, then in how many days A and B together will complete the work?
A. 22 days
B. 19 days
C. 10 days
D. 15 daysA, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every Third day?
A. 16 days
B. 18 days
C. 12 days
D. 15 daysB can work 3 times faster than A. They work together on a task and complete it in a day. How long does it take for B alone to complete the task ?
A. 3 days
B. 4 days
C. 32 hours
D. 48 hoursPart of task completed by A in a day = 1/x Part of task completed by B in a day = 3/x (B is thrice as efficient as A) (1/x)+(3/x) = 1 4/x = 1 x = 4 B completes 3/4th of the task in a day. He takes 4/3 days to complete the entire task. 4/3 days = (4/3*24) hours = 32 hours