Which of the following is a remedial measure for water-logging ?
A. Installation of lift irrigation systems
B. Controlling seepage from the canals
C. By lowering the F.S.L of the canals
D. Quick disposal of rainwater
Civil Engineering MCQs with answers for test preparation. The multiple-choice questions here cover topics like building construction, construction materials, geotechnical engineering, civil engineering construction, AutoCAD civil engineering, basic surveying, highway engineering, environmental engineering, Soil Mechanics and Foundation Engineering, airport engineering, civil and structural engineering analysis. This website is the best for Civil Engineering MCQs.
A. Installation of lift irrigation systems
B. Controlling seepage from the canals
C. By lowering the F.S.L of the canals
D. Quick disposal of rainwater
A. The crop production will be minimal per unit of available water
B. The irrigation extends to a large area with the lowest available supply
C. Agricultural production and protection against famine will be at optimum levels
D. It creates a perpetual scarcity of water
A. Cultivable Command Area/Net Irrigated Area
B. Gross Irrigated Area/Cultivable Command Area
C. Cultivable Command Area/Gross Irrigated Area
D. Net Irrigated Area/Cultivable Command Area
A. distribution reservoir
B. single-purpose reservoir
C. multipurpose reservoir
D. retarding basins
A. 10000 hectares
B. 5000 hectares
C. 2500 hectares
D. 2000 hectares
A. The purpose is Recreation and fishery
B. Reservoir for irrigation and water supply
C. Reservoir for irrigation and power
D. Reservoir for flood control, power, and irrigation
A. Quality Check of Irrigation Water
B. Maintenance of the Irrigation Structures
C. Recover Charges
D. Recommendations to States
A. Coir rope strainers
B. Continuous slot type of strainer
C. Pipe strainer with fine mesh jackets
D. Louver type of strainer
A. 1
B. 2
C. 3
D. 4
A. Double Flemish
B. Poly Flemish
C. Flemish
D. Single Flemish