A. 12 days
B. 8 days
C. 4 days
D. 6 days
(A + B + C)’s 1 day’s work = 1/6; (A + B)’s 1 day’s work = 1/8 (B + C)’s 1 day’s work = 1/12 (A + C)’s 1 day’s work = ( 2 X 1/6 ) – ( 1/8 + 1/12 ) = ( 1/3 – 5/24 ) = 3/24 = 1/8 So, A and C together will do the woirk in 8 days.