Water supply engineering is a branch of civil engineering that focuses on the planning, design, construction, operation, and maintenance of water supply systems.
Which of the following can be designated as an intake structure ?
A. dam
B. reservoir
C. culvert
D. riverThe design period of storage reservoir can be given as ____ ?
A. 30 yr
B. 10 yr
C. 50 yr
D. 20 yrWhich of the following can be identified as the objective of water supply scheme ?
A. safe water supply
B. ionization of water
C. chlorination of water
D. treat waterWhat are the types of flood control reservoirs ?
A. distribution reservoir and storage reservoir
B. distribution reservoir and multipurpose reservoir
C. storage reservoir and retarding reservoirs
D. multipurpose reservoir and single purpose reservoirWhich reservoir is also known as Mitigation reservoir ?
A. flood control reservoir
B. storage reservoir
C. conservation reservoir
D. multipurpose damWhich of the following units maximizes the design period ?
A. water treatment unit
B. pipe mains
C. demand reservoir
D. distribution systemWhat is the design discharge for intake structures ?
A. maximum weekly demand
B. average daily demand
C. maximum hourly demand
D. maximum daily demandWhat is the design period for the water treatment unit ?
A. 20 years
B. 30 years
C. 15 years
D. 10 yearsWhich factors affect the demand per capita ?
A. size of city, habit of people
B. cost of water, quality of water, size of city
C. cost of water, quality of water, size of city, habit of people
D. size of cityWhat is the fire demand of the city of 1lakh population by Buston’s formula ?
A. 566300
B. 5663000
C. 5663
D. 56630